Construction progress at King William Street

Kings Landscapes

Construction progress at King William Street

Kings Landscapes tendered and won the Hard and Soft Landscaping contract at King William Street.

Our construction team have now started on site and are busy marking out posts in red for Hendra Screens. These need to be installed so that waterproofing can be carried out around the bases before build up layers go in.

img_20161101_114358

Below are images of the BMW tracks where Kings Landscapes will be building a housing around the perimeter of the roof garden. 

img_20161101_114448

img_20161101_114509

img_20161101_114646

Kings used the supplied drawing to obtain dimensions and laser cut thin strips of metal to form a template, this was done to set out the brackets. A template is installed either side of both rails and checked using pre cut metal strips which hold the template in place and ensure complete parallel lines. As the rails are not fully installed, this is the only way of getting the brackets sport on!

img_20161101_151408

img_20161101_151451

 